![]() The existing bridges do not overtop during the 100 year event. It appears that the channel was straightened when these bridges were constructed. The channel bends just upstream of the existing bridge opening and flows through the crossing with the existing piers for both bridges skewed 10-20 degrees to the centerline of the channel. There are two existing parallel bridge structures with the south bridge carrying eastbound traffic and the north bridge carry westbound traffic.